Transportation

Traffic Impact Analysis

  • Peak Hour Trip
    • AM Peak Hour = 2PHT
    • PM Peak Hour = 4 PHT
  • Trip Generation
    • Peak Trip Hour Rate = 0.17
  • TIA Study
    • Level 0
    • No Improvements Needed


Pavement Design

Considerations
  • Expansive Soil
  • Flexible Pavement System w/Base Reinf.
Pavement Design
  • HMA Concrete Type B (6’’ Comp. Depth)
  • Flexible Base Course (6’’ Compacted Depth)
  • Subbase Course (10’’ Compc. Depth)
  • Concrete Surface Finish (Striping, Marks, Paving)
AASHTO Design Method
  • Design Reliability = 95%
  • Estimated Number of ESALs over a 25-year maximum performance





Recommended Access Control At Exit Ramp Jnct. With Frontage Rd.
  • Medians
    • Meets Limits Requirements
  • References
    • TxDOT
    • COSA